Projects

Selected work. Real results.

Case studies from recent installations, upgrades and repairs — each with the challenge we faced, the solution we delivered and the outcome the client walked away with.

Full home rewire

Domestic

Full home rewire

Private residence — Pretoria East

Complete rewire of a 4-bedroom home including DB board upgrade, surge protection and Certificate of Compliance issued on completion.

RewiringDB board upgradeSurge protectionCOC issue
Challenge
The 30-year-old wiring failed insulation testing and the DB board tripped intermittently, putting the family and appliances at risk.
Solution
We planned a 7-day rewire in phases so the family could stay on site, chased new conduit, installed a labelled Schneider DB and added whole-home surge protection.
Outcome
Every circuit passed insulation and continuity testing, a valid COC was issued the same week, and the client's insurer confirmed cover on the upgraded installation.
MCC panel installation

Industrial

MCC panel installation

Food processing plant — Isando

Motor Control Centre design, off-site fabrication, on-site install and full commissioning tied into existing PLC.

MCC designPanel fabricationPLC integrationCommissioning
Challenge
Production could only stop for a 36-hour weekend window and the new MCC had to integrate cleanly with an existing Siemens PLC.
Solution
Panels were pre-fabricated and factory-tested in our workshop, cabling was pre-labelled to an I/O map, and the changeover was rehearsed with the plant engineer.
Outcome
Commissioned and back in production 4 hours ahead of schedule, with zero fault trips in the first 90 days of operation.
Warehouse LED retrofit

Commercial

Warehouse LED retrofit

12,000m² distribution facility

High-bay LED upgrade with zonal occupancy control across a live warehouse.

Lighting designHigh-bay LED supplyOccupancy sensorsEmergency lighting
Challenge
Old metal-halide fittings were expensive to run, slow to strike after outages, and left dark aisles that slowed picking teams.
Solution
We modelled the space, specified 150W LED high-bays on a zonal DALI-style controller, and installed at night from a scissor lift so trading was never interrupted.
Outcome
Measured 62% reduction in lighting energy, uniform 300-lux picking aisles, and payback projected inside 22 months.
Residential solar + battery backup

Solar

Residential solar + battery backup

Sandton family home

8kW rooftop solar PV, 10kWh lithium battery and hybrid inverter tied into essential-circuit board.

Solar PVBattery storageHybrid inverterEssential-circuit rewire
Challenge
The client wanted full outage cover for lights, fridges, Wi-Fi and one office, without over-sizing the system.
Solution
We audited essential loads, sized a Sunsynk hybrid inverter with Pylontech batteries, rewired essentials onto a dedicated sub-board, and configured time-of-use logic.
Outcome
Household rides through load-shedding invisibly, monthly grid draw down 71%, and system commissioned with a signed hand-over pack.
Commercial standby generator

Commercial

Commercial standby generator

Corporate office park — Midrand

150kVA diesel standby generator, ATS panel and cable reticulation to essential MDB.

Generator supply & installAutomatic Transfer SwitchReticulationLoad testing
Challenge
The tenant needed guaranteed cover for servers and access control during municipal outages, with fully automatic transfer.
Solution
We installed the generator on a bunded concrete plinth, ran armoured cable to a new ATS, and load-tested against the real building profile.
Outcome
Transfer time under 8 seconds, tested monthly under an SLA, and zero unplanned downtime across the first year of operation.
Custom cable tray fabrication

Welding

Custom cable tray fabrication

Mining site — Northern Cape

On-site MIG welding and installation of custom galvanised cable tray runs and support brackets.

On-site weldingCustom bracketsCable tray installProtective coating
Challenge
Off-the-shelf brackets did not fit the site's steel structure and lead times for custom parts would have delayed the shutdown.
Solution
We measured on site, welded brackets in a mobile rig, dressed and zinc-primed the welds, then installed and populated the trays.
Outcome
Full tray run completed inside the planned shutdown window, coated for corrosion resistance and signed off by the site engineer.
Body corporate maintenance contract

Maintenance

Body corporate maintenance contract

Sectional title complex — Centurion

Quarterly preventative maintenance across 6 blocks including thermal scans, DB inspections and reactive callouts.

Preventative maintenanceThermal imagingReactive calloutsPhotographic reporting
Challenge
The complex had two electrical fires in eighteen months and the trustees needed a defensible maintenance record for insurers.
Solution
We audited every DB, tagged every circuit, ran a baseline thermal scan and rolled out a quarterly SLA with photo reports.
Outcome
Zero electrical incidents since take-over, insurance premium negotiated down, and trustees have a single point of contact for emergencies.
Distribution board upgrade

Commercial

Distribution board upgrade

Small business — Pretoria

Replacement of legacy DB with labelled Schneider board, RCDs and surge protection.

DB replacementRCD upgradeSurge protectionCOC
Challenge
Original board mixed old and new circuits with no labelling, tripping nuisance-style during rainy weather.
Solution
We mapped every circuit live, planned a Sunday swap-over, installed a new board with paired RCDs and issued a fresh COC.
Outcome
Zero nuisance trips since install, and staff can now safely isolate any circuit from the labelled schedule.
Home inverter and battery

Solar

Home inverter and battery

Family home — Centurion

5kW inverter and 5kWh lithium battery for essential lighting, Wi-Fi and study loads.

Inverter installBattery bankEssential sub-boardRuntime tuning
Challenge
Kids' online school kept dropping during outages and the client wanted a starter system they could grow later.
Solution
We installed a modular inverter with headroom for future PV, wired essential loads to a dedicated sub-board and documented runtime expectations.
Outcome
5+ hours of essential runtime, silent switchover, and a clear upgrade path when solar is added next year.
Office fit-out electrical

Commercial

Office fit-out electrical

Professional services firm

New tenant fit-out — power, data, lighting design and emergency egress.

Power reticulationData trunkingLighting designEmergency lighting
Challenge
Ceilings were dropped, cabling had to route above and around HVAC and the client needed clean, warm lighting for client-facing areas.
Solution
We coordinated with the shop-fit contractor, ran power and data in dedicated trunking, and specified 3000K downlights with dimmable drivers.
Outcome
Fit-out signed off on programme, snag list closed within 48 hours and emergency lighting certified before occupancy.
Kitchen renovation electrical

Domestic

Kitchen renovation electrical

Private residence — Centurion

Full electrical redesign for a renovated kitchen — appliances, under-counter lighting and dimmable pendants.

Kitchen wiringAppliance circuitsLED designDimmer controls
Challenge
The renovation added an induction hob and double oven that the original circuit couldn't feed safely.
Solution
We ran a dedicated feed from the DB, upgraded the RCBO, and layered task, ambient and accent lighting on separate dimmers.
Outcome
New kitchen commissioned on the builder's schedule, all appliances running clean and the client uses the accent scene nightly.
Warehouse three-phase upgrade

Industrial

Warehouse three-phase upgrade

Manufacturing SME

Production line power upgrade to accommodate two new CNC machines.

Three-phase reticulationSub-DBMachine wiringTesting
Challenge
Existing single-phase feed couldn't support the new machines and downtime had to be minimised.
Solution
We ran a new three-phase sub-main to a purpose-built sub-DB, terminated machine feeds in advance and cut over during a lunch break.
Outcome
Both machines commissioned within one shift, current draw balanced across phases and no impact on other production.
Balustrade repair — commercial

Welding

Balustrade repair — commercial

Commercial building lobby

TIG welding of stainless balustrades damaged by trolley impact, with finish grinding.

TIG weldingStainless repairFinish grindingOn-site work
Challenge
The balustrade was heavily used and the repair had to be invisible in a public-facing lobby.
Solution
We repaired on site out of hours, TIG-welded the stainless section, then dressed and polished the weld to match the original grain.
Outcome
Weld is invisible to the eye, no downtime for the building, and the building manager has kept us on speed-dial for future work.
Backup power — private residence

Domestic

Backup power — private residence

Sandton residence

Inverter and battery system covering essential circuits — lights, fridge, security and study.

Inverter installBattery bankRewire to essentialsClient training
Challenge
Family wanted silent, hands-off backup and clear guidance on what would run and for how long.
Solution
We sized the system to the essentials, wired to a dedicated sub-board and produced a one-page runtime card the family could stick on the DB.
Outcome
Zero manual intervention during outages, family reports 'we don't even notice load-shedding anymore.'

Let's talk power

Ready to start your next electrical project?

Get a fast, no-obligation quote from certified electricians. We respond within one business day.